White 415 User's Guide Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
21
Solid, Dry-lined, Stud Partition or Dry Partition Wall Structures
1. Before you decide on the final position of
your shower control, please bear in mind
the following :
- Decide on a suitable position for
the shower control. The position
of the shower control and the
shower fittings must provide a
minimum gap of 25 mm between
the spill-over level of the shower
tray/bath and the handset. This is
to prevent backsiphonage.
- Determine whether the hot or cold
water services will be connected to
the shower control from the top
(falling) or from the bottom (rising).
2. Remove the plastic building-in shroud.
The two M5 x 50 mm building-in shroud
retaining screws should be screwed
temporarily into the base of the shower
control for use later.
3. Familiarise yourself with the hot and
cold water inlet ports and outlet port.
They can be identified as follows:
The Mira CombiForce 415B is supplied
with inlet connections hot left, cold
right and top outlet as standard.
To change the position of the outlet refer
to “Reversed Outlet Connection”:
instructions 1. to 8. inclusive.
4. Determine the route for the incoming hot
and cold water supply pipework. The
outlet pipework to a flexible shower fitting
is best positioned to emerge above and
to one side of the shower control to allow
the flexible hose to drape around the
underside of the shower preventing the
hose from interfering with the knob (refer
to diagram).
25 mm
Minimum
Spill-over Level
Hose Retaining
Ring
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 51 52

Comments to this Manuals

No comments